General abbreviations

ac

=

nominal width inner chamber

amax

=

max. travel acceleration

aTL

=

distance lateral tabs inside to center of first divider

aTR

=

distance lateral tabs inside to center of last divider

ax

=

divider center to center distance

b1

=

inner width of guide channel

bA

=

distance between connection boreholes

BEF

=

overall width of cable carrier incl. attachments

Bi

=

inner width

Bk

=

outer width 

BKA

=

outer width of guide channel

Bp

=

width of hole stay inserts

BSt

=

stay width

c

=

distance between hole stay bores

d

=

diameter

D

=

bore diameter

dR

=

pipe diameter

H

=

connection height

H'

=

reduced connection height

hG

=

chain link height

hG'

=

chain link height incl. glide shoe

hi

=

inner height

Hi

=

inner height of frame stay assembly

hKA

=

outer height of guide channel

HS

=

half-stayed

Hz

=

installation height

KR

=

bending radius

l1

=

connection length

l2-5

=

connection dimensions

lA

=

length of end connector

LB

=

length of carrier in bend

LD

=

length of permitted sag

Lf

=

unsupported length

LES

=

length of energy conduit

Lk

=

cable carrier length without connection

LS

=

travel length

LV

=

fixed point offset

np

=

number of hole stay inserts

nRKR

=

number of RKR links

nT

=

number of dividers

nZ

=

number of comb teeth for strain relief 

qk

=

intrinsic cable carrier weight

qz

=

additional load

RKR

=

reverse bending radius

s

=

sheet metal thickness

SH

=

thickness of height separation

ST

=

thickness of divider

t

=

pitch

UB

=

loop overhang

VD

=

position of continuous height separations in divider

VR

=

position of partial height separations in divider

vmax

=

max. travel speed

VS

=

fully-stayed

Wf

=

base width of divider

z

=

pretension

International Exhibition calendar

»
26.
OCT
5th Med Ports 2017
Barcelona/Spain
»
31.
OCT
PTC ASIA 2017
Shanghai/China
»
01.
NOV

Your contact person

© 2016 TSUBAKI KABELSCHLEPP GmbH